Tear-off or roof-over: what Philadelphia allows

Two layers, slate, or a wet roof mean a full tear-off. The rules quoted, and what it means for an old rowhouse

Call (855) 365-0124 New roofs and full replacements · homeowners

This number connects homeowners who are planning a new roof or a full roof replacement with independent local roofing contractors. It is not for leak repairs or patch jobs. The call must come from the homeowner who decides on the roof. Calls may be recorded.

Roofs Philadelphia connects homeowners with independent local roofing contractors. We do not perform roofing work.

A roof-over (in code language, a roof recover) puts a new covering on top of the old one. It is quicker, and it is often not allowed. In Philadelphia the rule is in the EZ re-roofing standard that every roof covering permit follows.

The City's rule

All existing layers of roof coverings shall first be removed prior to installation of new roof coverings under the following conditions: Existing roof or roof covering is water-damaged or deteriorated Existing roof or roof covering is wood shake, slate, clay, cement, or asbestos-cement tile Existing roof consists of two (2) or more roof coverings

Philadelphia L&I, EZ Permit Standard: Re-Roofing, rev. 7/26.

The code behind it

The International Residential Code adopted in Pennsylvania says the same in R908.3.1.1, "Roof Recover Not Allowed": a recover is not permitted where the existing roof "is water soaked or has deteriorated to the point that the existing roof or roof covering is not adequate as a base for additional roofing," where it is slate, clay, cement or asbestos-cement tile, or "where the existing roof has two or more applications of any type of roof covering." The code's definition of a roof replacement (R908.3) is "the removal of existing layers of roof coverings down to the roof deck."

What it means for an old rowhouse

A house built before 1940, and 39.9% of Philadelphia's homes were (ACS 2020–2024), has usually been re-roofed several times. If the last job went over an older roof, there are already two coverings, and the next roof starts with a tear-off to the deck. The same is true if the roof holds water or is soft underfoot.

A tear-off has advantages the standard builds on: the deck can be seen, rotted boards replaced, flashing at the parapet and party walls rebuilt (rusted or damaged flashing may not be reused), and insulation added if wanted, which the standard then requires to reach R-49.

When a roof-over is allowed

Over a single sound covering that is not slate or tile, a recover can be permitted. Over wood shingles, the standard requires the whole surface to be covered first with gypsum board, mineral fiber, glass fiber or another approved material. Even where it is allowed, a contractor may advise against it once the roof has been seen; ask why, in writing.

On the paperwork

If damaged sheathing is found during the tear-off, the standard says the inspector must be notified, and more than 10% of the sheathing takes the job outside the EZ permit. The contractor's TP_019_F certificate at the end records whether less than 10% was replaced. Read more: what a replacement includes and roof permits.

Questions

Can you put a new roof over an old one in Philadelphia?

Only in some cases. The EZ re-roofing standard requires every layer to come off where the roof is water-damaged or deteriorated, is wood shake, slate, clay, cement or asbestos-cement tile, or already has two or more coverings. Over a single sound covering that is not slate or tile, a recover can be permitted.

Why do old Philadelphia rowhouses usually need a full tear-off?

Of Philadelphia’s homes, 39.9% were built before 1940, and a house that old has usually been re-roofed several times. If the last job went over an older roof, there are already two coverings, so the next roof starts with a tear-off to the deck. The same is true if the roof holds water or is soft underfoot.

What are the benefits of a full roof tear-off?

With the old layers off, the deck can be seen and rotted boards replaced, flashing at the parapet and party walls rebuilt rather than reused, and insulation added if you want it, in which case the standard requires it to reach R-49.

Can a new roof go over wood shingles in Philadelphia?

Where a recover is allowed over wood shingles, the City’s standard requires the whole surface to be covered first with gypsum board, mineral fiber, glass fiber or another approved material. Even where a roof-over is allowed, a contractor may advise against it after seeing the roof; ask for the reason in writing.

Sources: Philadelphia L&I, EZ Permit Standard: Re-Roofing, rev. 7/26; Pennsylvania Residential Code 2021 (IRC 2021), Chapter 9, via UpCodes; Philadelphia L&I, Roof Replacement Certification Form TP_019_F. Checked 2026-10-24.